BOSTON REGION METROPOLITAN PLANNING ORGANIZATION HOME CONTACT US SEARCH SITE MAP
Transportation Improvement Study for Routes 1A, 114, and 107, and Other Major Roadways in Downtown Salem
Posted 12/05Due to the size of this document, it may also be downloaded in sections
This study examined concerns of the City of Salem and citizens related to traffic congestion, pedestrian mobility, and access to public transportation. In consultation with a study advisory committee, the Boston Region MPO's Central Transportation Planning Staff conducted data collection, performed analyses using a traffic simulation model, and developed short-term and long-term improvements to address concerns in five areas: 1) Riley Plaza traffic circulation; 2) other congested intersections; 3) pedestrian circulation on Washington Street; 4) pedestrian access to the commuter rail station; and 5) pedestrian crossings at Saltonstall School.

The short-term improvements are generally low-cost and could be implemented relatively quickly. The long-term improvements are more costly but could be implemented in three to five years.
Request a CopyBack to Studies Page